Table 5-6 Table 5-6 consists of future precipitation change factors for the 2-year, 10-year, and 100-year design storms for each New Jersey county.
Table 5-5 Table 5-5 consists of current precipitation adjustment factors for the 2-year, 10-year, and 100-year design storms for each New Jersey county.
Table 5-3 Table 5-3 consists of structural systems and green infrastructure that may be used only with a waiver or variance.
Table 5-2 Table 5-2 consists of green infrastructure BMPs that can be used to meet water quantity standards. BMPs in this table provide alternatives for meeting water quantity requirements for larger sites. These BMPs cannot be used for water quality or groundwater recharge without a waiver/variance. When a development must meet all three (3) requirements, these systems can be used in conjunction with Table 5-1 BMPs.
Table 5-1 Table 5-1 consists of green infrastructure BMPs that can be used to meet water quality, water quantity, and groundwater recharge requirements. Table 5-1 presents options for the use of local, decentralized green infrastructure in order to maximize treatment and groundwater recharge.